Paving the Way to a Better Lifestyle

Completed Projects

City of Springdale, AR

Project Number: BP-0201
Huntsville Avenue-Phase I, Highway 71-B to Old Missouri Road
Contract Amount: $11,000,000
Completion Date: Fall 2008

Project Details

Widening Huntsville Avenue from 2-lanes to 5-Lanes for approximately 1.35 miles. Project includes major relocations of water distribution and transmission lines as well as sewer collection and trunk lines. Major storm drainage as well as precast bridge structure is also included. Roadway work includes grading, base course, curb & gutter, asphalt paving and concrete driveways and sidewalks.

City of Fort Smith, AR

Project Number: 00-02-C
Albert Pike Widening – Free Ferry Road to Grand Avenue
Contract Amount: $5,200,000
Completion Date: Fall 2007

Project Description

Widening Albert Pike from 2-lanes to 3-lanes for approximately .80 miles. Project includes major relocation of water distribution lines and sewer collection lines. Major storm drainage including pipe and precast box culverts are also included. Roadway work includes grading, base course, curb & gutter, asphalt paving, concrete paving, and concrete driveways and sidewalks.

City of Fort Smith, AR

Project Number: 02-00-A
Massard Road Extension
Contract Amount: $5,600,000
Completion Date: Winter 2007

Project Details

Project includes new construction of approximately 2.2 miles of 5-lane and 2-lane concrete roadway. Work includes major storm drainage facilities including pipe and precast box culverts. Roadway work includes grading, base course, concrete paving with integral curb and concrete sidewalk.

#Arkansas Highway & Transportation Department

Project Number: 040130
I-540 & Highway 59 Interchange Modifications & Frontage Roads
Contract Amount: $6,600,000
Completion Date: Winter 2007

Project Details

Project includes construction of new frontage roads and re-alignment of existing interstate ramps. Work includes grading, base course, asphalt paving, miscellaneous concrete work, traffic signals and interstate lighting.

#City of Rogers, AR

Project Number: AIP 3-05-0055
Taxiway "A" Improvements – Rogers Airport
Contract Amount: $4,200,000
Completion Date: Spring 2007

Project Details

Project includes construction of a new airfield taxiway and associated items. Work includes grading, base course, asphalt paving, storm drainage and airfield lighting.

#City of Alma, AR

Rudy Road Widening
Contract Amount: $2,600,000
Completion Date: Fall 2006

Project Details

Project includes widening Rudy Road from 2-lanes to 3-lanes approximately 1.2 miles. Work includes relocation of water distribution and sewer collection lines. Roadway work includes grading, base course, curb & gutter, asphalt paving and concrete driveways and sidewalk.

#City of Fort Smith, AR

Project Number: 99-02-A
Kelley Highway, Midland Blvd. to I-540
Contract Amount: $9,400,000
Completion Date: March 2005

Project Details

Widening Kelley Highway from 2 lanes to a 5 lane approximately 2 miles included in the project is utility relocations, major drainage improvements, traffic signals, water and sewer improvements, grading, asphalt binder base sub-layer and concrete paving.

#City of Fort Smith, AR

Project Number: 040223
Phoenix Avenue West
Contract Amount: $10,300,000
Completion Date: March 2005

Project Details

Widening Phoenix Avenue from 2 lanes to 5 lanes between State Line Road and Old Greenwood Road. Included in the project are grading, drainage systems, concrete channels, box culverts, curb and gutter, asphalt pavement, PC concrete intersection pavements, driveways / sidewalks, traffic signals.

#The Plantation (Phases I & II)

Rogers, AR
Contract Amount: $7,200,000
Completion Date: August 2005

Project Details

120-acre residential subdivision in Rogers, AR consisting of grading, water, sewer, storm drainage, curb & gutter, and asphalt paving.

#Chenal Addition

Rogers, AR
Contract Amount: $4,200,000
Completion Date: July 2005

Project Details

188-lot residential subdivision in Rogers, AR consisting of grading, water, sewer ,storm drainage, curb & gutter and asphalt paving.

#City of Fort Smith, AR

Project Number: 01-00-A
Airport Access Road
Contract Amount: $2,850,000
Contract Completion Date: Winter 2002

Project Details

Access roadways to new regional airport terminal including grading, storm drainage, water and sewer installations, concrete box culverts, aggregate base course and concrete paving.


Awards Won

2003 Arkansas/Oklahoma Excellence in Concrete Paving Award
Municipal Streets & Intersections > 30,000 SY Category
presented by Arkansas / Oklahoma Chapter of the American Concrete Pavement Association

#City of Fort Smith, AR

Project Number: 97-01-A
Massard Road Improvements
Contract Amount: $5,665,000
Completion Date: Spring Summer 2004

Project Details

Widen approximately 1.4 miles of Massard Road from 2 lanes to 5 lanes from Phoenix Ave. to Zero Street, including storm drainage improvements, traffic signals, and water and sewer improvements, grading, aggregate base course and 9-inch concrete paving.

Arkansas Highway & Transportation Department

State Job Number: B40101
Crawford Co. Line - East (F) / Franklin County
Contract Amount: $13,000,000
Completion Date: Fall 2001

Project Details

Reconstruct 7 miles of I-40 in Franklin County - This project consisted of Rubblizing PCC Pavement, Aggregate Base Course, Asphalt Paving (Base, Binder and Surface), Approach Slabs and Gutters.

Awards Won

2002 National Quality in Construction Award
presented by the National Asphalt Pavement Association (NAPA)

Arkansas Highway & Transportation Department

State Job Number: B40105
Dyer-Franklin Co. Line (F) / Crawford County
Contract Amount: $17,900,000
Completion Date: Fall 2002

Project Details

Reconstruct 8.5 miles of I-40 in Crawford County - This project consisted of Rubblizing PCC Pavement, Aggregate Base Course, Asphalt Paving (Base, Binder and Surface), Approach Slabs and Gutters.

Awards Won

2002 State Multi Lane Winner
presented by the Arkansas Asphalt Pavement Association (AAPA)

Arkansas Highway & Transportation Department

State Job Number: B40102
Ark. Mo. R.R. Overpass - East (F) / Crawford County
Contract Amount: $24,900,000
Completion Date: Fall 2003

Project Details

Reconstruct 10 miles of I-40 in Crawford County - This project consisted of Rubblizing PCC Pavement, Aggregate Base Course, Asphalt Paving (Base, Binder and Surface), Approach Slabs and Gutters.

Arkansas Highway & Transportation Department

State Job Number: 040150
Phoenix Avenue Extension
Contract Amount: $12,000,000
Completion Date: Fall 1997

Project Details

Construction of 3.5 miles of 5-lane roadway along new location including bridge structures, box culverts and drainage pipe, water and sewer relocations and traffic signals. New interstate off-ramp added by change order during construction.

City of Fort Smith, AR

Project Number: 98-14-C1
Midland Boulevard Water System Improvements
Contract Amount: $1,000,000
Completion Date: Spring 2000

Project Details

New 30-inch water transmission line including control valve replacement and modifications.

City of Fort Smith, AR

Project Number: 99-02-C1
24'' Water Transmission Line - 54th Street & Euper Lane Area
Contract Amount: $1,285,000
Completion Date: June 2001

Project Details

New 24-inch water transmission line including control valve modifications.

City of Fort Smith, AR

Project Number: 95-01-AU
Phoenix Avenue-West - Clearing, Demo & Utility Relocations
Contract Amount: $3,000,000
Completion Date: Spring 2002

Project Details

Right-of-way clearing, demolition of residential and commercial structures and relocation of water and sewer utilities for major roadway widening project.

City of Fort Smith, AR

Project Number: 95-01-AR
Phoenix Avenue-West - Railroad Crossing & Box Culvert
Contract Amount: $500,000
Completion Date: Winter 2002

Project Details

Installation of precast concrete railroad panels for roadway crossing of active tracks. Also, included the installation of a double precast box culvert under an active railroad track.